Item NO.:
YZWS-12-G-LJHPayment:
T/T & L/CProduct Origin:
Hebei, ChinaShipping Port:
TianjinLead Time:
about 30 daysProduct introduction
Design the breeding shed according to the customer's site requirements. The main frame adopts hot-dip galvanized oval tube or plastic-coated galvanized strip tube plating structure. According to the span size, the internal column support is set. The whole use of transfer connection accessories, galvanized bolts and self-tapping screws to fix the connection, to ensure the structural safety of the breeding shed.
Product features
The breeding shed is made of galvanized steel and assembled with galvanized sheets and galvanized screws. The top of the shed is covered with protective layers such as sun protection, heat preservation, waterproof, wind, and snow, etc.
Application
The steel structure plastic film breeding greenhouse, which is connected by multiple single films, is both heat and moisture resistant, occupies a small area, and has a wide range of applications. It has the advantages of long service life and low cost
FAQ
Q1: You are manufacture factory or trading company?
A: We are direct manufacture for steel structure buildings. we have rich experiance of steel structure designing,manufacturing, processing and installation.
Q2: Is your price competitive with other companies?
A: Our business goal is to give you the best price with same quality and best quality with the same price. We will try our best to reduce your cost.
Q3: Do you offer service for installation?
A: We will give detailed installation drawings and video for free. And if you need, we could send engineers as installation director even a team.
Q4: Do you accept container loading inspection?
A: You are welcomed to send an inspector, not only for the container loading, but any time during the production time.
Q5: Do you offer designing service for us?
A: Yes, we have experienced design team,and we can design full solution drawings as your requirements.
Q6: What is the delivery time?
A: Delivery time depends on order quantities. Generally, the delivery time will be 30 days after receiving deposit.
Q7: How can you get a quotation for your projects?
A: You can chat with us anytime or you can just fill out our questionnaire and send back to us. We will give you the best quotation asap.
Related Tags :